Every IFR flight plan answers one question twice: where does this flight land, and where else could it? The regulatory-framework lesson defined the family that answers the second half, the take-off alternate for a problem shortly after lift-off, the en-route alternate for a diversion along the way, and the destination alternate for the fogged-in arrival, all of them adequate aerodromes that are operational at the expected time of use. The EU definitions add a fourth name this course now needs: the fuel/energy ERA aerodrome, an en-route alternate that is required at the planning stage for use in the calculation of fuel. This lesson decides when each member must be selected, how far away it may lie, and what makes a candidate acceptable; the fuel that reaches them was priced in the flight-planning course.
The minimum time route
Before any alternate is chosen, the route itself is. The minimum time route is the route that gives the shortest flight time from departure to destination while adhering to all ATC and airspace restrictions. Both halves of that definition earn their keep. Shortest flight time is not shortest distance: with a jet stream on the tail, a track that looks like a detour on the chart can beat the great circle by half an hour, which is why long-range routes bend with the day's winds.
And the route must remain legal while it hunts the wind: danger areas, closed airspace, and ATC routing requirements all constrain the search. A computed track through an active restricted area is not a minimum time route, however fast; it is not a permissible route at all. The oceanic track systems of the next module are this idea made institutional, whole families of tracks re-drawn twice a day around the wind.
The take-off alternate
The flight-preparation lesson taught the trigger, and it belongs to the rule itself: a take-off alternate shall be selected and specified in the operational flight plan when the meteorological conditions at the departure aerodrome are below the operator's established aerodrome landing minima for that operation, or when it would be impossible to return to the departure aerodrome for other reasons. The purpose is written into the same rule: a safe landing must be possible in an abnormal or emergency situation just after take-off, which is why the comparison runs against landing minima while the take-off itself may be perfectly legal.
The rule also prices the choice. The take-off alternate shall lie within a distance that minimises the risk of exposure to potential abnormal or emergency situations, and the operator shall consider at least the same four considerations the flight-preparation lesson weighed:
Weather — the actual and forecast meteorological conditions at the candidate.
Infrastructure — the availability and quality of the aerodrome's infrastructure.
Capability with a failure — the aircraft's navigation and landing capabilities in abnormal or emergency conditions, taking the redundancy of critical systems into account.
Approvals held — ETOPS, LVO and the like, which decide what the crippled aeroplane may legally fly at the other end.
How far the alternate may lie is what the flight-preparation lesson deferred to this module, and the acceptable means of compliance prices it in flying time. The take-off alternate should not be farther from the departure aerodrome than:
Two-engined aeroplanes: 1 hour of flight time at the one-engine-inoperative cruising speed from the AFM, in ISA and still-air conditions, using the actual take-off mass.
ETOPS-approved twins: the approved ETOPS diversion time, subject to any MEL restriction, up to a maximum of 2 hours at the one-engine-inoperative cruising speed, same conditions.
Three- or four-engined aeroplanes: 2 hours of flight time at the all-engines-operating cruising speed, same conditions.
SET-IMC operations: for single-engined turbines approved under Part-SPA, 30 minutes of flying time at the normal cruising speed in still air, based on the actual take-off mass.
When the AFM of a multi-engined aeroplane contains no one-engine-inoperative cruising speed, the calculation should use the speed achieved with the remaining engine or engines set at maximum continuous power. The classic traps live in the speeds, not the hours: the twin's hour is flown on one engine, the three- and four-engined aeroplane's 2 hours are flown with every engine running, and the ETOPS figure is a ceiling that the approved diversion time may stretch toward, not an entitlement. ICAO Annex 6 draws the same picture with its own accent: two engines get the one-engine-inoperative hour, three or more get the all-engines 2 hours, and an EDTO operator whose distances offer no alternate within those bands may take the first available alternate within its approved maximum diversion time. Annex 6 adds the selection gate this lesson returns to below: the available information shall indicate conditions at or above the operating minima at the estimated time of use.